Woodside Energy Group (ASX: WDS) (NYSE: WDS) (LSE: WDS):
Woodside CEO Meg O’Neill said:
“We would like to acknowledge the tragic death in early October of an employee of one of the construction contractors at our Clean Ammonia Project in Beaumont, Texas.
“Safety is our top priority. We are taking steps to understand the circumstances around what occurred and are working closely with local authorities, OCI and the contractor company.
“Our production for the third quarter was a record 53.1 million barrels of oil equivalent. The strong operational performance was underpinned by the accelerated ramp-up of Sangomar and exceptional performance at Pluto LNG and NWS, which recorded 99.9% and 99.2% reliability respectively.
“Our 39% exposure to LNG gas hub indices allowed us to take advantage of increased LNG spot prices in the market over the period, demonstrating the importance of maintaining a balanced and flexible portfolio.
“At Sangomar the 24-well drilling program has been completed and the project has achieved nameplate capacity of 100,000 barrels per day. Commissioning activities continue to progress as planned and start-up of gas and water injection systems is underway.
The Scarborough Energy Project in Western Australia is now 73% complete and remains on target for first LNG cargo in 2026. Installation of the offshore Scarborough gas trunkline was completed in early October.
“At the end of September we completed the acquisition of OCI’s Clean Ammonia Project in Beaumont, Texas. Subsequent to quarter end, we completed the acquisition of Tellurian and its development opportunity, now named Woodside Louisiana LNG.
“The Clean Ammonia Project is expected to produce first ammonia in 2025 and at Woodside Louisiana LNG we are targeting final investment decision (FID) readiness from the first quarter of 2025. These acquisitions expand our diverse, geographically advantaged portfolio and position Woodside to execute our strategy to thrive through the energy transition and deliver long-term value to shareholders.
“Our sale and purchase agreement with JERA for the long-term supply of LNG from Woodside’s global portfolio again evidenced the value Asian customers place on our product.
“Woodside’s commitment to the domestic market was also demonstrated by the execution of gas sales of 66 petajoules (PJ) across 2025 and 2026 in Western Australia. In eastern Australia, to date we have executed sales of 63 PJ across 2025 and 2026 under an ongoing Expression of Interest process, with further sales expected to be completed in the fourth quarter.”
1 16% of total equity production in the quarter was sold on prices linked to gas hub indices. |
2 The completion % excludes the Pluto Train 1 modifications project. |
3 Production of lower carbon ammonia is conditional on supply of carbon abated hydrogen and ExxonMobil’s CCS facility becoming operational. See disclaimer and important notices on page 16 for information on “lower carbon ammonia”. |
Comparative performance at a glance
|
Q3 2024 |
Q2 2024 |
Change |
Q3 2023 |
Change |
YTD 2024 |
YTD 2023 |
Change % |
||
Revenue |
$ million |
3,679 |
3,033 |
21% |
3,259 |
13% |
9,681 |
10,673 |
(9%) |
|
Production4 |
MMboe |
53.1 |
44.4 |
20% |
47.8 |
11% |
142.4 |
139.1 |
2% |
|
|
Gas |
MMscf/d |
2,001 |
1,885 |
6% |
2,001 |
- |
1,939 |
2,000 |
(3%) |
|
Liquids |
Mbbl/d |
226 |
157 |
44% |
169 |
34% |
180 |
159 |
13% |
|
Total |
Mboe/d |
577 |
488 |
18% |
520 |
11% |
520 |
510 |
2% |
Sales |
MMboe |
55.8 |
48.0 |
16% |
53.3 |
5% |
149.7 |
152.1 |
(2%) |
|
|
Gas |
MMscf/d |
2,154 |
2,103 |
2% |
2,341 |
(8%) |
2,075 |
2,292 |
(9%) |
|
Liquids |
Mbbl/d |
228 |
159 |
43% |
169 |
35% |
182 |
155 |
17% |
|
Total |
Mboe/d |
606 |
528 |
15% |
579 |
5% |
546 |
557 |
(2%) |
Average realised price |
$/boe |
65 |
62 |
5% |
60 |
8% |
63 |
69 |
(9%) |
|
Capital expenditure5 |
$ million |
3,033 |
1,233 |
146% |
1,360 |
123% |
5,445 |
4,135 |
32% |
|
|
Capex excl. acquisitions |
$ million |
1,133 |
1,233 |
(8%) |
1,360 |
(17%) |
3,545 |
4,135 |
(14%) |
|
Acquisitions6 |
$ million |
1,900 |
- |
100% |
- |
100% |
1,900 |
- |
100% |
Operations
Pluto LNG
North West Shelf (NWS) Project
4 Q3 2024 includes 0.28 MMboe, Q2 2024 includes 0.30 MMboe and Q3 2023 includes 0.26 MMboe primarily from feed gas purchased from Pluto non-operating participants processed through the Pluto-KGP Interconnector. |
5 Includes capital additions on property plant and equipment, exploration and evaluation capitalised, other corporate spend and investment expenditure on Beaumont Clean Ammonia Project. |
6 Acquisition of OCI’s Clean Ammonia Project in Beaumont, Texas. |
Bass Strait
Sangomar
Gulf of Mexico
Marketing and Trading
Projects
Scarborough Energy Project
7 16% of total equity production in the quarter was sold on prices linked to gas hub indices (16% of total equity production year to date). |
Trion
Woodside Louisiana LNG (Driftwood LNG)
Decommissioning
Exploration and development
Calypso
Browse
Sunrise
8 Includes $50 million for Tellurian’s Series C Convertible Preferred equity shares, ~$65 million of net debt, ~$20 million net working capital adjustment, ~$50 million for management and debt change of control costs and ~$135m of interim funding from signing to close. Does not include management construction incentive payment awards. The accounting treatment of the purchase price will be included in Woodside’s 2024 Annual Report and will include share purchase consideration, interim funding and other items. |
Exploration
New energy and carbon solutions
Beaumont Clean Ammonia Project
H2OK
Woodside Solar
Carbon capture and storage (CCS) opportunities
Corporate activities
London Stock Exchange listing
Funding
9 Production of lower carbon ammonia is conditional on supply of carbon abated hydrogen and ExxonMobil’s CCS facility becoming operational. See disclaimer and important notices on page 18 for information on “lower carbon ammonia”. |
Hedging
Climate and sustainability
Upcoming events 2024 - 2025
November 2024 |
6-7 |
Australia investor site visit |
January 2025 |
22 |
Q4 2024 Report |
2024 full-year guidance
|
|
Prior |
Current |
Production |
MMboe |
185 – 195 (505 – 533 Mboe/day) |
189 – 195 (516 – 533 Mboe/day) |
Capital expenditure10 |
$ billion |
5.0 – 5.5 |
4.8 – 5.2 |
Gas hub exposure11 |
% of produced LNG |
26 – 33 |
33 – 37 |
10 Capital expenditure includes the following participating interests; Sangomar (82%); Scarborough (90% following completion of the transaction with LNG Japan in March 2024 and 74.9% following completion of the transaction with JERA, expected in the second half of 2024), Pluto Train 2 (51%) and Trion (60%). Trion capital expenditure includes Pemex carry. This guidance assumes no change to these participating interests in 2024. This excludes the impact of any future asset sell-downs, acquisitions or other changes in equity. |
11 Gas hub indices include Japan Korea Marker (JKM), TTF and National Balancing Point (NBP). It excludes HH. |
Production summary
|
|
Q3 2024 |
Q2 2024 |
Q3 2023 |
YTD 2024 |
YTD 2023 |
Gas |
MMscf/d |
2,001 |
1,885 |
2,001 |
1,939 |
2,000 |
Liquids |
Mbbl/d |
226 |
157 |
169 |
180 |
159 |
Total |
Mboe/d |
577 |
488 |
520 |
520 |
510 |
|
|
Q3 2024 |
Q2 2024 |
Q3 2023 |
YTD 2024 |
YTD 2023 |
AUSTRALIA |
|
|||||
LNG |
|
|||||
North West Shelf |
Mboe |
7,029 |
7,088 |
6,590 |
22,309 |
25,009 |
Pluto12 |
Mboe |
12,007 |
11,726 |
12,261 |
35,487 |
33,180 |
Wheatstone |
Mboe |
2,565 |
1,959 |
2,610 |
6,881 |
7,654 |
Total |
Mboe |
21,601 |
20,773 |
21,461 |
64,677 |
65,843 |
|
|
|
|
|
|
|
Pipeline gas |
|
|
|
|
|
|
Bass Strait |
Mboe |
4,069 |
3,410 |
4,591 |
9,838 |
11,894 |
Other13 |
Mboe |
4,016 |
3,848 |
3,472 |
11,142 |
9,589 |
Total |
Mboe |
8,085 |
7,258 |
8,063 |
20,980 |
21,483 |
|
|
|
|
|
|
|
Crude oil and condensate |
|
|
|
|
|
|
North West Shelf |
Mbbl |
1,265 |
1,260 |
1,278 |
3,937 |
4,508 |
Pluto12 |
Mbbl |
966 |
933 |
976 |
2,830 |
2,636 |
Wheatstone |
Mbbl |
474 |
380 |
477 |
1,316 |
1,310 |
Bass Strait |
Mbbl |
701 |
503 |
982 |
1,696 |
2,663 |
Macedon & Pyrenees |
Mbbl |
633 |
107 |
688 |
849 |
2,078 |
Ngujima-Yin |
Mbbl |
1,231 |
974 |
1,140 |
3,091 |
2,009 |
Okha |
Mbbl |
615 |
491 |
608 |
1,572 |
1,460 |
Total |
Mboe |
5,885 |
4,648 |
6,149 |
15,291 |
16,664 |
|
|
|
|
|
|
|
NGL |
|
|
|
|
|
|
North West Shelf |
Mbbl |
288 |
279 |
276 |
857 |
907 |
Pluto12 |
Mbbl |
55 |
59 |
53 |
168 |
148 |
Bass Strait |
Mbbl |
1,152 |
941 |
1,380 |
2,925 |
3,294 |
Total |
Mboe |
1,495 |
1,279 |
1,709 |
3,950 |
4,349 |
|
|
|
|
|
|
|
Total Australia14 |
Mboe |
37,066 |
33,958 |
37,382 |
104,898 |
108,339 |
Mboe/d |
403 |
373 |
406 |
383 |
397 |
12 Q3 2024 includes 1.89 MMboe of LNG, 0.08 MMboe of condensate and 0.05 MMboe of NGL, Q2 2024 includes 2.18 MMboe of LNG, 0.10 MMboe of condensate and 0.06 MMboe of NGL and Q3 2023 includes 2.07 MMboe of LNG and 0.08 MMboe of condensate and 0.05 MMboe of NGL processed at the Karratha Gas Plant (KGP) through the Pluto-KGP Interconnector. |
13 Includes the aggregate Woodside equity domestic gas production from all Western Australian projects. |
14 Q3 2024 includes 0.28 MMboe, Q2 2024 includes 0.30 MMboe and Q3 2023 includes 0.26 MMboe primarily from feed gas purchased from Pluto non-operating participants processed through the Pluto-KGP Interconnector. |
|
|
Q3 2024 |
Q2 2024 |
Q3 2023 |
YTD 2024 |
YTD 2023 |
INTERNATIONAL |
|
|
|
|
|
|
Pipeline gas |
|
|||||
Gulf of Mexico |
Mboe |
327 |
324 |
350 |
1,011 |
1,029 |
Trinidad & Tobago |
Mboe |
2,289 |
1,736 |
2,413 |
6,528 |
7,372 |
Other15 |
Mboe |
- |
- |
17 |
- |
47 |
Total |
Mboe |
2,616 |
2,060 |
2,780 |
7,539 |
8,448 |
|
|
|
|
|
|
|
Crude oil and condensate |
|
|
|
|
|
|
Atlantis |
Mbbl |
2,351 |
2,019 |
2,714 |
6,811 |
8,202 |
Mad Dog |
Mbbl |
2,363 |
2,944 |
2,188 |
8,072 |
4,754 |
Shenzi |
Mbbl |
2,047 |
2,333 |
2,158 |
6,785 |
7,353 |
Trinidad & Tobago |
Mbbl |
143 |
94 |
201 |
363 |
792 |
Sangomar |
Mbbl |
5,902 |
540 |
- |
6,442 |
- |
Other15 |
Mbbl |
81 |
81 |
36 |
243 |
156 |
Total |
Mboe |
12,887 |
8,011 |
7,297 |
28,716 |
21,257 |
|
|
|
|
|
|
|
NGL |
|
|
|
|
|
|
Gulf of Mexico |
Mbbl |
515 |
355 |
362 |
1,263 |
1,043 |
Other15 |
Mbbl |
- |
- |
10 |
- |
27 |
Total |
Mboe |
515 |
355 |
372 |
1,263 |
1,070 |
|
|
|
|
|
|
|
Total International |
Mboe |
16,018 |
10,426 |
10,449 |
37,518 |
30,775 |
Mboe/d |
174 |
115 |
114 |
137 |
113 |
|
|
|
|
|
|
|
|
Total production |
Mboe |
53,084 |
44,384 |
47,831 |
142,416 |
139,114 |
Mboe/d |
577 |
488 |
520 |
520 |
510 |
15 Overriding royalty interests held in the GoM for several producing wells. |
Product sales
|
|
Q3 2024 |
Q2 2024 |
Q3 2023 |
YTD 2024 |
YTD 2023 |
Gas |
MMscf/d |
2,154 |
2,103 |
2,341 |
2,075 |
2,292 |
Liquids |
Mbbl/d |
228 |
159 |
169 |
182 |
155 |
Total |
Mboe/d |
606 |
528 |
579 |
546 |
557 |
|
|
Q3 2024 |
Q2 2024 |
Q3 2023 |
YTD 2024 |
YTD 2023 |
AUSTRALIA |
|
|||||
LNG |
|
|||||
North West Shelf |
Mboe |
7,353 |
7,081 |
7,639 |
22,442 |
27,206 |
Pluto |
Mboe |
12,014 |
12,749 |
12,622 |
35,276 |
33,524 |
Wheatstone16 |
Mboe |
3,048 |
2,264 |
2,541 |
7,901 |
7,203 |
Total |
Mboe |
22,415 |
22,094 |
22,802 |
65,619 |
67,933 |
|
|
|
|
|
|
|
Pipeline gas |
|
|
|
|
|
|
Bass Strait |
Mboe |
4,163 |
3,508 |
4,506 |
10,241 |
11,701 |
Other17 |
Mboe |
3,816 |
3,435 |
3,243 |
10,145 |
9,222 |
Total |
Mboe |
7,979 |
6,943 |
7,749 |
20,386 |
20,923 |
|
|
|
|
|
|
|
Crude oil and condensate |
|
|
|
|
|
|
North West Shelf18 |
Mbbl |
1,253 |
1,904 |
1,471 |
4,371 |
4,155 |
Pluto |
Mbbl |
858 |
1,283 |
1,228 |
2,781 |
2,456 |
Wheatstone |
Mbbl |
360 |
666 |
689 |
1,355 |
1,348 |
Bass Strait |
Mbbl |
662 |
271 |
1,407 |
1,530 |
2,524 |
Ngujima-Yin |
Mbbl |
1,082 |
1,018 |
708 |
3,099 |
1,849 |
Okha |
Mbbl |
618 |
572 |
1,297 |
1,808 |
1,950 |
Macedon & Pyrenees |
Mbbl |
498 |
- |
1 |
994 |
1,551 |
Total |
Mboe |
5,331 |
5,714 |
6,801 |
15,938 |
15,833 |
|
|
|
|
|
|
|
NGL |
|
|
|
|
|
|
North West Shelf |
Mbbl |
249 |
266 |
263 |
770 |
688 |
Pluto |
Mbbl |
52 |
49 |
32 |
156 |
287 |
Bass Strait |
Mbbl |
1,142 |
361 |
959 |
2,288 |
2,971 |
Total |
Mboe |
1,443 |
676 |
1,254 |
3,214 |
3,946 |
|
|
|
|
|
|
|
Total Australia |
Mboe |
37,168 |
35,427 |
38,606 |
105,157 |
108,635 |
Mboe/d |
404 |
389 |
420 |
384 |
398 |
16 Includes periodic adjustments reflecting the arrangements governing Wheatstone LNG sales of 0.29 MMboe in Q3 2024, 0.19 MMboe in Q2 2024 and 0.16 MMboe in Q3 2023. |
17 Includes the aggregate Woodside equity domestic gas production from all Western Australian projects. |
18 Includes reclassification of purchased condensate volumes from NWS JV Participants to Marketing liquids of 0.16 MMboe in Q3 2023 and 0.26 MMboe in Q2 2023. |
|
Q3 2024 |
Q2 2024 |
Q3 2023 |
YTD 2024 |
YTD 2023 |
|
INTERNATIONAL |
|
|
|
|
|
|
Pipeline gas |
|
|
|
|
|
|
Gulf of Mexico |
Mboe |
286 |
336 |
321 |
908 |
1,005 |
Trinidad & Tobago |
Mboe |
2,004 |
1,606 |
2,574 |
6,067 |
7,569 |
Other19 |
Mboe |
2 |
5 |
7 |
13 |
20 |
Total |
Mboe |
2,292 |
1,947 |
2,902 |
6,988 |
8,594 |
|
|
|
|
|
|
|
Crude oil and condensate |
|
|
|
|
|
|
Atlantis |
Mbbl |
2,436 |
2,013 |
2,442 |
6,875 |
7,820 |
Mad Dog |
Mbbl |
2,489 |
3,043 |
2,041 |
8,158 |
4,610 |
Shenzi |
Mbbl |
2,032 |
2,430 |
2,123 |
6,814 |
7,448 |
Trinidad & Tobago |
Mbbl |
221 |
19 |
242 |
292 |
903 |
Sangomar |
Mbbl |
6,070 |
- |
- |
6,070 |
- |
Other19 |
Mbbl |
45 |
59 |
61 |
164 |
189 |
Total |
Mboe |
13,293 |
7,564 |
6,909 |
28,373 |
20,970 |
|
|
|
|
|
|
|
NGL |
|
|
|
|
|
|
Gulf of Mexico |
Mbbl |
388 |
454 |
379 |
1,255 |
1,084 |
Other19 |
Mbbl |
1 |
3 |
4 |
7 |
11 |
Total |
Mboe |
389 |
457 |
383 |
1,262 |
1,095 |
|
|
|
|
|
|
|
Total International |
Mboe |
15,974 |
9,968 |
10,194 |
36,623 |
30,659 |
Mboe/d |
174 |
110 |
111 |
134 |
112 |
|
|
|
|
|
|
|
|
MARKETING20 |
|
|
|
|
|
|
LNG |
Mboe |
2,077 |
2,593 |
4,329 |
6,756 |
12,344 |
Liquids21 |
Mboe |
555 |
37 |
169 |
1,163 |
429 |
Total |
Mboe |
2,632 |
2,630 |
4,498 |
7,919 |
12,773 |
|
|
|
|
|
|
|
Total Marketing |
Mboe |
2,632 |
2,630 |
4,498 |
7,919 |
12,773 |
|
|
|
|
|
|
|
Total sales |
Mboe |
55,774 |
48,025 |
53,298 |
149,699 |
152,067 |
Mboe/d |
606 |
528 |
579 |
546 |
557 |
19 Includes periodic adjustments reflecting the arrangements governing Wheatstone LNG sales of 0.29 MMboe in Q3 2024, 0.19 MMboe in Q2 2024 and 0.16 MMboe in Q3 2023. |
20 Includes the aggregate Woodside equity domestic gas production from all Western Australian projects. |
21 Includes reclassification of purchased condensate volumes from NWS JV Participants to Marketing liquids of 0.16 MMboe in Q3 2023 and 0.26 MMboe in Q2 2023. |
Revenue
|
Q3 2024 |
Q2 2024 |
Q3 2023 |
YTD 2024 |
YTD 2023 |
AUSTRALIA |
|||||
North West Shelf |
520 |
524 |
575 |
1,636 |
2,512 |
Pluto |
920 |
891 |
923 |
2,556 |
2,778 |
Wheatstone22 |
237 |
202 |
246 |
662 |
774 |
Bass Strait |
344 |
247 |
379 |
814 |
918 |
Macedon |
48 |
48 |
41 |
147 |
145 |
Ngujima-Yin |
94 |
91 |
64 |
277 |
164 |
Okha |
51 |
46 |
103 |
147 |
159 |
Pyrenees |
44 |
- |
- |
88 |
139 |
|
|
|
|
|
|
INTERNATIONAL |
|
|
|
|
|
Atlantis |
194 |
168 |
209 |
558 |
611 |
Mad Dog |
192 |
249 |
170 |
645 |
354 |
Shenzi |
160 |
205 |
178 |
555 |
577 |
Trinidad & Tobago23 |
63 |
38 |
17 |
162 |
265 |
Sangomar |
464 |
- |
- |
464 |
- |
Other24 |
3 |
5 |
5 |
13 |
14 |
|
|
|
|
|
|
Marketing revenue25 |
285 |
265 |
298 |
777 |
1,121 |
|
|
|
|
|
|
Total sales revenue26 |
3,619 |
2,979 |
3,208 |
9,501 |
10,531 |
|
|
|
|
|
|
Processing revenue |
54 |
52 |
50 |
167 |
135 |
Shipping and other revenue |
6 |
2 |
1 |
13 |
7 |
|
|
|
|
|
|
Total revenue |
3,679 |
3,033 |
3,259 |
9,681 |
10,673 |
22 Q3 2024 includes -$28 million, Q2 2024 includes -$10 million and Q3 2023 includes $11 million recognised in relation to periodic adjustments reflecting the arrangements governing Wheatstone LNG sales. These amounts will be included within other income/(expenses) in the financial statements rather than operating revenue. |
23 Includes the impact of periodic adjustments related to the production sharing contract (PSC). |
24 Overriding royalty interests held in the GoM for several producing wells. |
25 Values include revenue generated from purchased LNG and Liquids volumes, as well as the marketing margin on the sale of Woodside’s produced LNG and liquids portfolio. Marketing revenue excludes hedging impacts and cargo swaps where a Woodside produced cargo is sold and repurchased from the same counterparty to optimise the portfolio. The margin for these cargo swaps is recognised net in other income. |
26 Total sales revenue excludes all hedging impacts. |
Realised prices
|
Units |
Q3 2024 |
Q2 2024 |
Q3 2023 |
Units |
Q3 2024 |
Q2 2024 |
Q3 2023 |
|
LNG produced27 |
$/MMBtu |
10.8 |
9.6 |
10.3 |
$/boe |
68 |
60 |
65 |
|
LNG traded28 |
$/MMBtu |
11.2 |
9.1 |
8.2 |
$/boe |
71 |
58 |
52 |
|
Pipeline gas |
|
|
|
|
$/boe |
38 |
38 |
28 |
|
Oil and condensate |
$/bbl |
78 |
83 |
82 |
$/boe |
78 |
83 |
82 |
|
NGL |
$/bbl |
48 |
44 |
45 |
$/boe |
48 |
44 |
45 |
|
Liquids traded28 |
$/bbl |
60 |
79 |
72 |
$/boe |
60 |
79 |
72 |
|
|
|
|
|
|
|
|
|
||
Average realised price for pipeline gas: |
|
|
|
|
|
|
|
||
|
Western Australia |
|
|
|
|
A$/GJ |
6.5 |
6.5 |
6.1 |
|
East coast Australia |
|
|
|
|
A$/GJ |
14.2 |
14.3 |
12.3 |
|
International |
|
|
|
|
$/Mcf |
4.3 |
3.9 |
3.8 |
Average realised price |
|
$/boe |
65 |
62 |
60 |
||||
|
|
|
|
|
|
|
|
|
|
Dated Brent |
|
$/bbl |
80 |
85 |
87 |
||||
JCC (lagged three months) |
|
$/bbl |
88 |
84 |
84 |
||||
WTI |
|
|
|
|
$/bbl |
75 |
81 |
82 |
|
JKM |
|
|
|
|
$/MMBtu |
12.4 |
9.6 |
10.9 |
|
TTF |
|
|
|
|
$/MMBtu |
11.2 |
9.2 |
10.3 |
Average realised price increased 5% from the prior quarter reflecting higher JKM, JCC and TTF.
27 Realised prices include the impact of periodic adjustments reflecting the arrangements governing Wheatstone LNG sales. |
28 Excludes any additional benefit attributed to produced volumes through third-party trading activities. |
Capital expenditure (US$ million)
|
Q3 2024 |
Q2 2024 |
Q3 2023 |
YTD 2024 |
YTD 2023 |
Exploration and evaluation capitalised29,30 |
6 |
38 |
3 |
82 |
132 |
Property plant and equipment |
1,076 |
1,135 |
1,313 |
3,301 |
3,821 |
Other31 |
51 |
60 |
44 |
162 |
182 |
Sub Total (excluding acquisitions) |
1,133 |
1,233 |
1,360 |
3,545 |
4,135 |
Acquisitions |
1,900 |
- |
- |
1,900 |
- |
Total |
3,033 |
1,233 |
1,360 |
5,445 |
4,135 |
|
Q3 2024 |
Q2 2024 |
Q3 2023 |
YTD 2024 |
YTD 2023 |
Sangomar |
73 |
206 |
257 |
489 |
808 |
Scarborough |
438 |
563 |
613 |
1,575 |
1,817 |
Trion |
225 |
137 |
111 |
459 |
119 |
Beaumont Clean Ammonia Project |
1,900 |
- |
- |
1,900 |
- |
Other |
397 |
327 |
379 |
1,022 |
1,391 |
Total |
3,033 |
1,233 |
1,360 |
5,445 |
4,135 |
Other expenditure (US$ million)
Q3 2024 |
Q2 2024 |
Q3 2023 |
YTD 2024 |
YTD 2023 |
|
Exploration and evaluation expensed32 |
90 |
46 |
123 |
190 |
256 |
Permit amortisation |
2 |
3 |
3 |
8 |
7 |
Total |
92 |
49 |
126 |
198 |
263 |
Trading costs |
132 |
128 |
265 |
405 |
887 |
29 Exploration capitalised represents expenditure on successful and pending wells, plus permit acquisition costs during the period and is net of well costs reclassified to expense on finalisation of well results. |
30 Project final investment decisions result in amounts of previously capitalised exploration and evaluation expense (from current and prior years) being transferred to oil and gas properties. This table does not reflect the impact of such transfers. |
31 Other primarily incorporates corporate spend including SAP build costs, carbon costs and other investments. |
32 Includes seismic and general permit activities and other exploration costs. |
Exploration or appraisal wells drilled
Region |
Permit Area |
Well |
Target |
Interest (%) |
Spud Date |
Water depth (m) |
Actual well depth (m)33 |
Remarks |
Congo |
Marine XX |
Niamou |
Oil |
22.5% |
24 May |
2,094 |
6,928 |
Drilling |
Permits and licences
Key changes to permit and licence holdings during the quarter ended 30 September 2024 are noted below.
Region |
Permits or licence areas |
Change in interest (%) |
Current interest (%) |
Remarks |
Australia |
WA-554-P |
100% |
100% |
Licence entry |
Gulf of Mexico |
GB 729, GB 772, |
(40%) |
0 |
Licence expiry |
Egypt – Nile Delta34 |
Tiba Block |
40% |
40% |
Licence entry
|
33 Well depths are referenced to the rig rotary table. |
34 Subsequent to the period |
Production rates
Average daily production rates (100% project) for the quarter ended 30 September 2024:
|
Woodside |
Production rate |
Remarks |
|
|
Sept 2024 |
June 2024 |
|
|
AUSTRALIA |
|
|
|
|
NWS Project |
|
|
|
|
LNG |
29.58% |
259 |
256 |
|
Crude oil and condensate |
29.71% |
46 |
46 |
|
NGL |
29.71% |
10 |
10 |
|
|
|
|
|
|
Pluto LNG |
|
|
|
|
LNG |
90.00% |
122 |
116 |
Production was higher following completion of planned maintenance activities in Q2. |
Crude oil and condensate |
90.00% |
10 |
10 |
|
|
|
|
|
|
Pluto-KGP Interconnector |
|
|
|
|
LNG |
100.00% |
21 |
24 |
|
Crude oil and condensate |
100.00% |
1 |
1 |
|
NGL |
100.00% |
1 |
1 |
|
|
|
|
|
|
Wheatstone36 |
|
|
|
|
LNG |
12.02% |
232 |
212 |
Production was higher due to improved reliability. |
Crude oil and condensate |
14.68% |
33 |
30 |
|
|
|
|
|
|
Bass Strait |
|
|
|
|
Pipeline gas |
43.83% |
102 |
86 |
Production was higher due to increased seasonal domestic gas demand. |
Crude oil and condensate |
46.73% |
16 |
12 |
|
NGL |
47.40% |
26 |
23 |
|
|
|
|
|
|
Australia Oil |
|
|
|
|
Ngujima-Yin |
60.00% |
22 |
18 |
Production at Ngujima-Yin and Okha was higher due to improved reliability and production optimisation. |
Okha |
50.00% |
13 |
11 |
|
Pyrenees |
63.48% |
11 |
2 |
Production at Pyrenees was higher following completion of planned turnaround in Q2. |
|
|
|
|
|
Other |
|
|
|
|
Pipeline gas37 |
|
44 |
42 |
|
|
35 Woodside share reflects the net realised interest for the period. |
36 The Wheatstone asset processes gas from several offshore gas fields, including the Julimar and Brunello fields, for which Woodside has 65% participating interest and is the operator. |
37 Includes the aggregate Woodside equity domestic gas production from all Western Australian projects. |
|
Woodside |
Production rate |
Remarks |
|
|
|
Sept 2024 |
June 2024 |
|
INTERNATIONAL |
|
|
|
|
Atlantis |
|
|
|
|
Crude oil and condensate |
38.50% |
66 |
58 |
Production was higher following completion of planned turnaround activities in Q2, partially offset by weather. |
NGL |
38.50% |
5 |
4 |
|
Pipeline Gas |
38.50% |
7 |
5 |
|
|
|
|
|
|
Mad Dog |
|
|
|
|
Crude oil and condensate |
20.86% |
123 |
155 |
Production was lower due to planned interventions and weather. |
NGL |
20.86% |
7 |
5 |
|
Pipeline Gas |
20.86% |
2 |
3 |
|
|
|
|
|
|
Shenzi |
|
|
|
|
Crude oil and condensate |
65.02% |
34 |
39 |
Production was lower due to planned well intervention, unplanned downtime, and weather. |
NGL |
64.69% |
3 |
2 |
|
Pipeline Gas |
63.93% |
1 |
1 |
|
|
|
|
|
|
Trinidad & Tobago |
|
|
|
|
Crude oil and condensate |
57.49%39 |
3 |
2 |
Production was higher following completion of planned maintenance activities in Q2. |
Pipeline gas |
50.31%39 |
49 |
39 |
|
|
|
|
|
|
Sangomar |
|
|
|
|
Crude Oil |
78.74%39 |
81 |
8 |
Production was higher due to continued ramp-up and commissioning of the field. |
38 Woodside share reflects the net realised interest for the period. |
39 Operations governed by production sharing contracts, Woodside share may change monthly. |
Disclaimer and important notice
Forward looking statements
This report contains forward-looking statements with respect to Woodside’s business and operations, market conditions, results of operations and financial condition, including, for example, but not limited to, statements regarding long-term demand for Woodside’s products, development, completion and execution of Woodside’s projects, expectations regarding future capital expenditures, the payment of future dividends and the amount thereof, future results of projects, operating activities and new energy products, expectations and plans for renewables production capacity and investments in, and development of, renewables projects expectations and guidance with respect to production, capital and exploration expenditure and gas hub exposure, and expectations regarding the achievement of Woodside’s net equity Scope 1 and 2 greenhouse gas emissions reduction and new energy investment targets and other climate and sustainability goals.
All statements, other than statements of historical or present facts, are forward-looking statements and generally may be identified by the use of forward-looking words such as ‘guidance’, ‘foresee’, ‘likely’, ‘potential’, ‘anticipate’, ‘believe’, ‘aim’, ‘aspire’, ‘estimate’, ‘expect’, ‘intend’, ‘may’, ‘target’, ‘plan’, ‘strategy’, ‘forecast’, ‘outlook’, ‘project’, ‘schedule’, ‘will’, ‘should’, ‘seek’ and other similar words or expressions. Similarly, statements that describe the objectives, plans, goals or expectations of Woodside are forward-looking statements.
Forward-looking statements in this report are not guidance, forecasts, guarantees or predictions of future events or performance, but are in the nature of future expectations that are based on management’s current expectations and assumptions.
Those statements and any assumptions on which they are based are subject to change without notice and are subject to inherent known and unknown risks, uncertainties, assumptions and other factors, many of which are beyond the control of Woodside, its related bodies corporate and their respective officers, directors, employees, advisers or representatives.
Important factors that could cause actual results to differ materially from those in the forward-looking statements include, but are not limited to, fluctuations in commodity prices, actual demand for Woodside’s products, currency fluctuations, geotechnical factors, drilling and production results, gas commercialisation, development progress, operating results, engineering estimates, reserve and resource estimates, loss of market, industry competition, environmental risks, climate related risks, physical risks, legislative, fiscal and regulatory developments, changes in accounting standards, economic and financial markets conditions in various countries and regions, political risks, the actions of third parties, project delay or advancement, regulatory approvals, the impact of armed conflict and political instability (such as the ongoing conflict in Ukraine and in the Middle East) on economic activity and oil and gas supply and demand, cost estimates, the effect of future regulatory or legislative actions on Woodside or the industries in which it operates, including potential changes to tax laws, the impact of general economic conditions, inflationary conditions, prevailing exchange rates and interest rates and conditions in financial markets, and risks associated with acquisitions, mergers and joint ventures, including difficulties integrating businesses, uncertainty associated with financial projections, restructuring, increased costs and adverse tax consequences, and uncertainties and liabilities associated with acquired and divested properties and businesses.
A more detailed summary of the key risks relating to Woodside and its business can be found in the “Risk” section of Woodside’s most recent Annual Report released to the Australian Securities Exchange and the London Stock Exchange and in Woodside’s most recent Annual Report on Form 20-F filed with the United States Securities and Exchange Commission and available on the Woodside website at https://www.woodside.com/investors/reports-investor-briefings. You should review and have regard to these risks when considering the information contained in this report.
If any of the assumptions on which a forward-looking statement is based were to change or be found to be incorrect, this would likely cause outcomes to differ from the statements made in this report.
Investors are strongly cautioned not to place undue reliance on any forward-looking statements. Actual results or performance may vary materially from those expressed in, or implied by, any forward-looking statements. None of Woodside nor any of its related bodies corporate, nor any of their respective officers, directors, employees, advisers or representatives, nor any person named in this report or involved in the preparation of the information in this report, makes any representation, assurance, guarantee or warranty (either express or implied) as to the accuracy or likelihood of fulfilment of any forward-looking statement, or any outcomes, events or results expressed or implied in any forward-looking statement in this report.
All forward-looking statements contained in this report reflect Woodside’s views held as at the date of this report and, except as required by applicable law, Woodside does not intend to, undertake to, or assume any obligation to, provide any additional information or update or revise any of these statements after the date of this report, either to make them conform to actual results or as a result of new information, future events, changes in Woodside’s expectations or otherwise.
Past performance (including historical financial and operational information) is given for illustrative purposes only. It should not be relied on as, and is not necessarily, a reliable indicator of future performance, including future security prices.
Other important information
All figures are Woodside share for the quarter ending 30 September 2024, unless otherwise stated.
All references to dollars, cents or $ in this report are to US currency, unless otherwise stated.
References to “Woodside” may be references to Woodside Energy Group Ltd and/or its applicable subsidiaries (as the context requires).
Units of measure and conversion factors
Product |
Unit |
Conversion factor |
Natural gas |
5,700 scf |
1 boe |
Condensate |
1 bbl |
1 boe |
Oil |
1 bbl |
1 boe |
Natural gas liquids |
1 bbl |
1 boe |
|
|
|
Facility |
Unit |
LNG conversion factor |
Karratha Gas Plant |
1 tonne |
8.08 boe |
Pluto Gas Plant |
1 tonne |
8.34 boe |
Wheatstone |
1 tonne |
8.27 boe |
The LNG conversion factor from tonne to boe is specific to volumes produced at each facility and is based on gas composition which may change over time.
Term |
Definition |
bbl |
barrel |
bcf |
billion cubic feet of gas |
boe |
barrel of oil equivalent |
GJ |
gigajoule |
Mbbl |
thousand barrels |
Mbbl/d |
thousand barrels per day |
Mboe |
thousand barrels of oil equivalent |
Mboe/d |
thousand barrels of oil equivalent per day |
Mcf |
thousand cubic feet of gas |
MMboe |
million barrels of oil equivalent |
MMBtu |
million British thermal units |
MMscf/d |
million standard cubic feet of gas per day |
PJ |
petajoules |
scf |
standard cubic feet of gas |
TJ |
terajoule |
This announcement was approved and authorised for release by Woodside’s Disclosure Committee.
View source version on businesswire.com: https://www.businesswire.com/news/home/20241015929378/en/