News Image

Nova Drills 29m @ 7.1 g/t Au from Surface at RPM in Advance of Resource Update

Provided By GlobeNewswire

Last update: Oct 23, 2024

Anchorage, Alaska, Oct. 23, 2024 (GLOBE NEWSWIRE) -- Nova Minerals Limited (“Nova” or the “Company”) (NASDAQ: NVA) (ASX: NVA) (FRA: QM3) is pleased to announce further high-grade thick intercepts from the final six holes of the 21 hole reverse circulation (RC) drilling program conducted in the RPM starter pit area in 2024, within its over 500km2 flagship Estelle Gold Project, located in the Tintina Gold Belt in Alaska. The shallow drilling program was focused on near surface mineralization <50m in depth in support of the RPM starter mine PFS currently underway.

Read more at globenewswire.com

NOVA MINERALS LTD -29

NASDAQ:NVAWW (12/8/2025, 8:00:02 PM)

40.98

+0.98 (+2.45%)


NOVA MINERALS LTD-ADR

NASDAQ:NVA (12/10/2025, 8:08:55 PM)

After market: 8.09 -0.05 (-0.61%)

8.14

+0.03 (+0.37%)



Find more stocks in the Stock Screener

Follow ChartMill for more