News Image

LIFT Intersects 27 m at 1.26% Li2O and 22 m at 1.53% Li2O at its Fi Main pegmatite, Yellowknife Lithium Project, NWT

Provided By GlobeNewswire

Last update: Jan 16, 2024

VANCOUVER, British Columbia, Jan. 16, 2024 (GLOBE NEWSWIRE) -- Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to report assays from 8 drill holes completed at the BIG West, Nite, & Fi Main pegmatites within the Yellowknife Lithium Project (“YLP”) located outside the city of Yellowknife, Northwest Territories (Figure 1). Drilling intersected significant intervals of spodumene mineralization, with the following highlights:   

Read more at globenewswire.com
Follow ChartMill for more